Project OS-39 2019-01-23T12:40:01+00:00

Welcome

Welcome to the applied research project entitled: Capacity increment of the welding laboratory аt Nikola Vaptsarov Naval Academy

Project aim: Enhancement of the laboratory capabilities by: Creating additional workplaces (welding posts) equipped with TIG welding machines, thus increasing the range of the welding methods covered by the laboratory.

Members of the team:

  • Commander Hristo Valeriev Hristov, PhD, Chief Assistant at the Department of Ship Repairs
  • Assoc. Prof. Georgi Kanchev Lyutskanov, PhD, Head of the Department of Ship Repairs
  • Captain (N) Yulian Vasilev Moskov, Assoc. Prof., PhD, at the Department of Ship Repairs
  • Lieutenant Commander Momchil Galinov Manov, PhD, Chief Assistant Professor at the Department of Ship Repairs
  • Assistant Kalin Georgiev Lyutskanov, Assistant Professor at the Department of Ship Repairs and doctoral student
  • Assistant Dimitar Vasilev Vasilev, Assistant Professor at the Department of Ship Repairs
  • Cadet Victor Karov, fifth-year student
  • Assoc. Prof. Plamen Dichev Dichev, PhD, Dean of the Faculty of Shipbuilding at the Technical University, as consultant

Project duration: 01.01.2018 – 28.02.2018

Tasks:

  1.  Design of the location of the equipment in the welding laboratory after the purchase;
  2.  Installation and calibration of the new equipment;
  3.  Development of procedures for working with the new equipment;
  4.  Development of instructions for HSE protection;
  5.  Development of a methodology for conducting laboratory exercises;
  6.  Testing of the new equipment;
  7. Reporting the results of the project implementation.

Work program

№ of tasks

Duration in months

1 2
1. Design of the location of the equipment in the welding laboratory after the purchase
2. Installation and calibration of the  new equipment
3. Development of procedures for working with the new equipment
4.  Development of instructions for HSE protection
5. Development of a methodology for conducting laboratory exercises for welding
6. Testing of the new equipment.
7. Reporting the results of the project implementation